Besucher 
Contact / Imprint      
Broschures

Harrer Ingenieure

Broschure of our company

Download PDF-File

On this year's IABSE symposium (International Association for Bridge and Structural Engineering) in Budapest, Hungary, Mr. Gerold from Harrer Ingenieure will give a presentation:


Economic Viability of Modern Timber Bridges - Lifespan and Costs of Maintenance

The complete life-cycle costs of a bridge are essentially composed of the planning and investment costs for the new structure on one hand, and the maintenance costs over the estimated life time on the other hand. In a german study with official verification, annual maintenance costs were obtained for so called "covered" substructures made of timber. The average annual maintenance costs were obtained from a representative quantity of way over 50 timber bridges to less then 1 % - based on construction costs. For such timber bridges "with protective cover" the actual level of quality is consistent with that of road bridges constructed from steel, reinforced or prestressed concrete. It could also be confirmed that in the case of protected timber bridges, on maintenance costs no differentiation must be made between foot bridges and road bridges. Road bridges are constructed in a very robust way and often have a closed road surface, usually in the form of an asphalt sealing.

Download the complete presentation (PDF, 2 MB)

Download the short lecture (PDF)

IABSE Symposium 2004

Metropolitan Habitats and Infrastructure
Shanghai, China
September 22- 24, 2004

Download Powerpointpresentation (PDF, 3.5 MB)



Challenges in Timber

Innovations in composite
construction - connecting techniques - outlook

Download short lecture (PDF, 1.8 MB)



IABSE REPORT SHANGHAI 2004

'Metropolitan Habitats and Infrastructure', Shanghai 2004, Symposium papers are presented according to four topics: Planning and Evaluation; Design and Analysis; Construction and Materials; Maintenance, Operation and Life Cycle Consideration. Volume with abstracts and CD with full papers available, and can be ordered on the iabse website. More information:

http://www.iabse.org/publications/iabsereports/v88.php

Bloc Glued Laminated Decks for Timber Bridges

- by now, a proven design in Germany

Download PDF-File

Webdesign:ki-werkstatt, Karlsruhe                 Letzte Änderung: 27.08.2012                 © 2008-2012 Harrer Ingenieure